Thursday, February 28, 2013

February Sewing

Here were my February Goals
Finish binding on Easy Street and Bricks Quilt - Sewn on but not turned yet.
Courthouse steps blocks to a quilt top - Done
Grants March to a quilt top - Done
Cut out a whirligig baby quilt  - Done


Courthouse Steps -- 208 blocks - 3,536 pieces
I am glad to have this top together.  Now I need to decide how to quilt it.  Originally I was planning to stitch in the ditch, but I am really rethinking that plan.  It worked fine on my test sample that was only 20x20.  This quilt is not exceptionally huge, but it is heavy enough, the constant turning will be difficult.  Right now I am leaning towards machine quilting baptist fans. Since I don't typically mark my quilting, I am researching the best way to get this thing marked and quilted.  I know my machine quilter could have this done by now, but I am determined to complete this one start to finish all myself.


Grant's March - Top Completed
I was surprised at how small this was when I got it together.  I don't recall the sample being that small when I bought the kit at the quilt show.  My main complaint with this pattern, it assumes the user has a specialty ruler.  It does indicate the pattern is written for an Easy Angle ruler, but the pattern does not give alternate directions.  I needed to redraft \ figure out measurements on each block and the borders. I am also not a fan of patterns that "ball park" finished sizes.  I do love how this turned out and will make a nice throw.  Not sure if I will quilt this, or send it out.




Whirligig Baby Quilt - My small group makes a baby quilt for any babies and grand babies that are born to any of our immediate families.  We also make wedding quilts, milestone birthday quilts, divorce quilts, and any other occasion that warrants a quilt.  Our standard pattern for babies is the whirligig pattern.  Often the settings are different but we always use this as our block.  My job is cutting kits.  We have learned with this pattern one person needs to do all of the cutting, so that the whirligigs are the right size and spinning the right way.  For this one, I cut the kits at retreat, we sewed up the blocks and top and then I took it home and basted and quilted it.  It has already been passed off for someone else to do the binding and label.  This will get presented at a baby shower in March, but we will be on vacation, so I will miss it.



Jingle
I am really enjoying this project.  I have never finished a hand applique project and I am looking forward to continue working on this one.  I don't really mind the prep work, except for the little bitty pieces and the berries.   I even enjoyed doing the embroidery stem work.  Here is the center block in progress, still need to add the flower center, and some berries.








Dear Jane
This quilt.  I have a love \ hate relationship with it.  I love the little blocks when they are done, but I find that I curse my way through most of the blocks.  I also did my first triangle.  hmmm...someone said - "once you start on the triangles, you will catch the fever and just like the blocks you will want to keep going."  I didn't catch that bug.  I am not feeling the love for the triangles yet.  I will have to soon, I am almost done with the blocks.  Less than 25 left to go. I am also getting a little peer pressure on this one.  Our guild show theme this year is "Legacy of Quilting" and wouldn't it be just wonderful if your Dear Jane would be done in time for the show. 

Oh my, that is a lot of work before October.  I don't know if I can do it. It took me 15 years to do the center, I am thinking it might take me another 10 years to do the borders.  That would be a Legacy miracle to get it done in 25 years.


Just Takes 2 - 2013 School house
I really feel like I missed out on the original Just takes 2 Red and white version, and I don't want to pay $70+ for the patterns, so I am just going to jump in to the 2013 School house version.   I made the sections for 26 school house blocks.  I modified the rooftop part of the pattern, because I just could not get my set in seams to consistently look good.  I am using Minick and Simpson Moda fabric from the Indigo Crossing line.  I have always wanted to make a blue and white schoolhouse quilt, so I decided this would be the year.   I didn't get the January six inch blocks done, but I have the patterns saved.  Having the schoolhouses done will make this project a lot easier.


Easy Street and Brown Bricks quilt -- Binding sewn on both, but didn't get it turned.  I take my binding with me to Sunday night dinner at the inlaws -- So that gives me about 1.5 hours to work on it each week, slow and steady progress, I should have them done soon enough.


Goals for March will be light, since we are gone for 10 days on vacation, and it will probably take me that many days to get ready and then recover.

March Goals:
Turn binding on Easy Street and Brown Bricks
Finish applique on Jingle medallion
Dear Jane Progress - Either more blocks or put rows together

Linking up with Patchwork Times.

2 comments:

  1. You had a great variety of projects to work on in February and they all look great. Enjoy your vacation!

    ReplyDelete
  2. You have really been busy! I think you accomplished lots and everything looks wonderful. I love courthouse steps and grants march. ~Jeanne

    ReplyDelete