Showing posts with label Jingle. Show all posts
Showing posts with label Jingle. Show all posts

Wednesday, January 1, 2014

December Sewing

I have been enjoying my winter break from work.  The kids go back to school tomorrow, and I go back to work.


December Goals:
Work on Bonnie Hunter's Mystery - Celtic Solstice - In progress...keeping up with the clues so far.
Small Group gift exchange small quilt - Done sort of, I made a quilt, but decided on a different gift.
Shipshewana BOM - Done



Celtic Solstice -
I have been keeping up...here are all of the parts through Clue 5. Bonnie posted the reveal today, New Years Day, so I will be working on this while everybody else is watching the Outback Bowl.


Small Group Gift exchange - my small group does a homemade gift exchange for the holiday item can be baked, crochet, knitting, crafty, quilted...anything goes.  Originally I planned to give this, but when I went shopping for a frame, I didn't like the options.  I came home with this plastic frame, but I really didn't like it.

So I decided on a plan B.  I do digital scrapbook layouts, so I made this up instead. I framed it and thought it could hang in someones sewing room.  I need to get one printed for my room.  I love hanging with this group of gals, so inspiring and I learn something new whenever we are together.  And we are raising another generation of crafty girls!


Shipshewana BOM -  I changed up the star on this block.  I had the Tri Rec ruler on my cutting table, so I used that.


Raffle quilt block -    I picked up a kit for a raffle quilt block at the last guild meeting.  Not sure what the final design will be but the theme of the next show is "Symphony of Quilts"



Jingle -  I got the top done.  I will probably send this out for quilting.  Indoor pictures for these...it is snowing and too cold to take these outside for pictures and it is bigger than my design wall.

Schoolhouse Sampler -  Top almost done.  I can't find the yardage for the last border.  I will finish this one as soon as I find that hunk of fabric.


Robins Nest -  Let's just say this quilt is a challenge.  I will be glad to get the last two borders on this one.  



ISU quilt top and pillowcase - I don't have a backing for this one yet, but will quilt this one myself.




I need to decide which Block of the months I will do in 2014.  I am not sure yet which ones I am going to do.  I do want to make good progress on a Sue Garman pattern, so I think I will set a monthly goal to do 8-10 Shoofly and Double 9-patch blocks. If I did that many each month, I still won't have enough at the end of the year for the quilt, but I will have a nice stack.  If I use my civil war repros that I am using for my Shipshewana quilt, I can work on them at the same time.  This will be my Leader \ Ender project for the year.  I need to work on my Dear Jane also, maybe I will plan to do a few triangles a month also.  These blocks are small...they finish smaller than 7" inches.




I think that I will still keep doing the monthly goals, that seemed to help me stay focused.  By the end of 2014, I would like to be finishing my Dear Jane top.  I think I will choose another block of the month from Homestead Hearth quilt shop.

So my January goals will be:
Finish Robins Nest top
Ten Double 9-patch blocks
Two Shipshewana blocks
Four Dear Jane Triangles

Saturday, August 3, 2013

July Sewing

Here were my July Goals:

July Goals -
Finish Courthouse Steps - Done
Little quilt for the small quilt silent auction - almost finished, need to turn binding
Preemie Project quilt - almost finished, need to turn binding


I really focused on getting my Courthouse Steps quilt completely finished. I entered it into the Marcus contest, and it is now at the Iowa State fair.  I even added the hanging sleeve so it is ready for the guild quilt show.  I also decided to send Grant's March to the quilter.  I entered it into the Des Moines show, hope it gets back in time.

Courthouse Steps


Shipeshewana Scrap Happy
Blocks 7 & 8.




Just Takes 2
I got section 1 pieced together.


All of the blocks for section 2 are done.  Applique blocks for section 3 are prepped.  I need my sewing machine back to keep making progress on this one.


Afternoon Delight
Only one block this month.   I had been taking this block of the month from Quakertown Quilts; at the end of the month they sent a cryptic email stating they were no longer doing block of the month autoships, but I could buy the remaining kits at a 10%discount, but would need to go to the designer to fully complete my set.  Upon further investigation, they have decided to close.  So fabric is marked down 50% and patterns 25%.  Why would I pay nearly full price for these same kits?  I didn't appreciate the way the whole thing was handled.  I contacted Sue Garman and she was more than accommodating and I plan to just purchase the remaining patterns directly from her.

Jingle
Only one block posted this month.


Mini quilts -
Quilted up these minis, I need to turn binding on them.  I will donate at least one to the silent auction.
I quilted up several other small quilts, I need to turn binding on those also.


Not sure how long I will be without a sewing machine.  Here are my goals:
August Goals:
Just Takes 2 - finish sections 2 and 3
Shipeshewana blocks
Jingle blocks

Monday, July 1, 2013

June Sewing

Here were my June Goals -
Make significant progress quilting Courthouse steps - In progress
Dear Jane triangles - None
Jingle blocks - Done


As anticipated June was a light sewing month. Baseball, home improvement projects, and an ill family member has been keeping us busy.  We only have one more long baseball weekend; for the rest of the summer, games will only be in the evenings.  I still have hexagons to finish, so I will need to keep working on those while waiting for kids at camps, football practice, scouts etc.

Courthouse Steps
I have started quilting this, and just not happy with how it is going.  I started with stitching in the ditch, and ended up picking it out.  Then I switched to grid quilting and decided I really wanted curves in the quilting.  I had already ruled out baptist fans, so I decided to do melons within the grids.  I am not loving this project now, so it just sits. My deadline for completion for contest entry in end of July...we'll  see how it ends up, but I don't think I will be entering this in any contest. I will get it done to put in the fair and our local quilt show.  I should have done Baptist Fans, I think I would have been much happier with the results.



Shipshewana Scrap Happy - Blocks 5/6



Just Takes 2 - Red
Almost done with blocks in section 1.  The only block left in this section is the large applique block.  There is more paper piecing than I like, but I keep pushing through.  I surprisingly enjoyed piecing the feathered star block, I haven't done one before and I like the way it turned out. It was time consuming, but I may consider doing a whole feathered star quilt.  I think I will have section 1 together next month, and will start working on blocks for section 2.


Jingle 
Here are the June Jingle blocks.  These are free patterns posted a couple times a month at by Erin at One Piece at a Time. 




Afternoon Delight
I got six applique blocks done this month.  I am getting better at needleturn.  I also really like the white lead Sewline pencil for marking on dark fabric.


July Goals -
Finish Courthouse Steps
Little quilt for the small quilt silent auction
Preemie Project quilt


Hoping for some sewing time over the extended 4th of July holiday weekend.  I need to decide which quilts I am going to focus on for entering in the fair and the October quilt show, and I need to get some donations done for the show, a mini-quilt for the silent auction, and a community service project quilt. 

So far my possible list of quilts:
Easy Street - Done
Courthouse Steps - finish quilting and binding
Grant's March - needs quilting and binding

Linking up to Patchwork Times - Design wall Monday


Sunday, March 31, 2013

March Sewing

As suspected, I did not get much sewing done this month.   We did take a much needed 12 day family vacation, so we are still trying to get back into the swing of our normal routine.  Suitcases are unpacked, but I have loads of laundry to do.  We are also hosting Easter dinner, so not much time to settle into my sewing room.  We are also moving into our busy season -- All three kids will be playing baseball \ softball, which means almost every night and weekend will be busy!  I need to make sure I have my hexagon project box in the car.

Here is a picture from vacation:


My March goals were:
  • Turn binding on Easy Street and Brown Bricks - Easy Street is DONE! Brown bricks still needs to be finished.  I still need to get a picture of Easy Street, but I am waiting for the weather to get a bit nicer.
  • Finish applique on Jingle medallion - DONE!
  • Dear Jane Progress - Either more blocks or put rows together.

Dear Jane:
I have all 169 blocks for the center done! These are the last 16 I needed to finish.  Next I need to trim them to size, and put together the blocks with sashing and start working on border triangles.



Jingle:
I finished the applique and pieced block, and also finished the medallion center.  So far I am keeping up!





Not sure how much sewing time I will have in April, we have a lot of ball games and kid activities.

April Goals:
Turn binding on Brown Bricks
Sew Dear Jane blocks together
Keep up with Jingle blocks
Mark and pin baste Courthouse Steps


Linking up to Patchwork Times

Sunday, March 10, 2013

Packing for Spring Break

Here is my project box that will travel with me on vacation.  I had planned on taking just my hexagons but a new Jingle applique block was posted, so I spent some time prepping that block and now it is ready to take along also.  If I have time, I will cut a few more hexagons to baste.  This should keep me busy on the plane, and not take much room in my carry on, since I always end up being the pack mule for everyone else. 

I looked up the regulations on the the TSA website, I shouldn't have any problems with my needles and little scissors.  I am not taking any chances though, so I am leaving my nice scissors home and I picked up some small cheap scissors, just in case they get confiscated. 


Laundry is done.  I went to the grocery store last night for snacks.  Still need to go to Target for some miscellaneous stuff like sunscreen, a new SD card, and some activity books. Next week at this time I will be on a cruise ship enjoying the sun, and not looking out my window at freezing rain with a snowstorm on the way.



Sunday, February 17, 2013

Jingle Block of the Month - Progress Report 1

I am working on Erin Russek's block of the month.  Free patterns can be found on her blog - One Piece at a Time.


Applique Block 1 -  I haven't added the berries yet.  I am debating on doing applique or small red buttons.  I also have some small black beads for the bird eyes that I need to add.  I used 8wt Perle cotton for the embroidered stems.

I am using the template \ starch method to prepare the applique shapes.  It does take some time in the prep work, but I find the applique is so much more relaxing for me than doing needleturn.



Pieced block 1 - This went together quickly.


Center block - I have the stems stitched down, and have started on the leaves. 

Linking up to What a Hoot - Block of the month Monday.