Sunday, July 29, 2012

July Sewing

I didn't get both of the blocks done this month, but still plan to do the other one. 


I ordered a small quilt of the month kit from Temecula Quilt Shop.   I decided I want to do a bunch of little quilts and hang them on the walls of the hall to my sewing room.  I got this top done and the blocks done for another simple quilt, but didn't get that top finished.  This one is little 2inch bowtie blocks in patriotic fabrics. The border I used was meant to be for binding, so I will probably use a red fabric for binding this one.




Farmers Wife Quilt Along - Barrister Block Blog - Randi took a break from posting patterns this month, but I continued to work through the book.  I got nine blocks done this month. 


 I only got two sets of basket blocks done.  So I have five sets done, 20 to go.


I entered six quilts in the Iowa State Fair. Here is the stack after I got them all folded and tagged.  I am bummed I will miss the "Preview Night" because I will be out of town.  All of the quilt entrants are invited to view the quilts before the fair opens.  It is fun to see lots of local quilters, and the kids like to go because it is half price on the big slide and the corndog and funnel cake booth are usually open.

 


Lots of changes in August.  The nanny is going back to college, school is starting, baseball is finishing, football is starting, so we will all need to get back in our school routine.

I am going to a four day "art retreat".  The topic of the class I am taking is Zentangle.  I am looking forward to learning something new, but I am a little nervous since I am a complete beginner.   I have been busy getting my supplies together for the class.

Sunday, July 1, 2012

June Sewing

Here are some of the sewing things I worked on in June.


Quilt Square Quilt Along - Jo's Country Junction



Six inch sampler - Barrister's Block Blog.  Still working through the Farmers Wife book, but also selecting blocks from the Civil War Quilt books by Rosemary Youngs.

 


I finally decided on fabric for my Twisted Sister small group - School House Sampler. I haven't started my assignments yet.  The stacks are too pretty to dismantle.  This is Moda fabric designed by Bonnie and Camille.


I bartered quilting this small baby quilt, in exchange for my friend to turn binding on a few of my finished quilts.





Basket block exchange.  A few of us in my sewing group are trading basket blocks.  I got three sets of blocks done in June.  My goal will be one set a week.  I think I need a total of 25 sets - 125 blocks. No deadline on this but a few of the girls already have a lot more done, so I need to get going on this.


Now that competitive baseball is over, I should have some weekend sewing time, I am hopeful I can find more time to sew.  I need to decide which quilts I am going to enter into the State fair, and also the guild show in September.  Then I will need to get busy finishing binding and putting on hanging sleeves, I also need to work on some applique flower blocks for a charity auction.