Showing posts with label Dear Jane. Show all posts
Showing posts with label Dear Jane. Show all posts

Sunday, March 9, 2014

February Sewing

As suspected, I didn't get much sewing done in February.  A short month, combined with long work hours, Girl Scout cookie season, Jeff being in China for two weeks, and fighting off a terrible cold, I was too exhausted to do much more than collapse in my recliner every night. My February update, is even late!

Here were my goals:
February Goals: 
Two - Shipshewana blocks - Done
Six - Dear Jane triangles - Done
Eight -  Double nine patch blocks- not done


Shipshewana Block of the month:



Dear Jane Triangles:



Double Nine patch - I did get enough nine patches done for about 20 blocks, but I didn't get the blocks sewn.  These take a lot of time.   It seems like I have cut a ton of 1.5 inch squares for these, but my little box is about empty.  My goal next month will be to get all of these 9 patches sewn into blocks, and get some cutting done so I can make some more little 9 patches.


This month we are taking a Disney cruise during spring break.  Unlike previous years, we plan to drive to Florida and not fly.  I need to get some hand work prepped for the car ride. 


My goals for March:
16 Double nine patch blocks
Two Shipshewana blocks

Saturday, February 1, 2014

January Sewing

My January goals were:
Finish Robins Nest top - Not done.
Ten Double 9-patch blocks -Done
Two Shipshewana blocks - Done
Four Dear Jane Triangles - Done

Robin's Nest:  I have to do the last border. The stars are done, I need to cut some triangles, and applique some hexagon in the open corners of the borders I already finished.  This one makes my brain hurt, and it is testing my skills.   I needed to take a break on this one.  I will probably finish this one at winter retreat.


Dear Jane -  These don't look much like triangles yet, as I will trim them when I am ready to start putting together the borders.  These are all from the top row.  Learning to tolerate paper piecing, as that is the best way to get most of these done.  

Double Nine Patch -  oyy...these are smaller than 7 inches and time consuming, luckily they are easy.  I am doing the nine patches as leaders \ enders project, and as I am working on my other projects, I am cutting my scraps into pieces to use on this.   I got 11 done this month.
 
Temecula Small quilt - This was the kit for January, and I made it according to the instructions, but it doesn't look like the sample picture.  I think the squares should have started larger, but I didn't have enough fabric in the kit to cut the squares larger.  Oh well, I think I will add a blue border to frame this. 

Shipshewana BOM:

Celtic Winter Solstice -Borders on, backing pieced.  Just need to get this sent to the quilter.  


School House Quilt - borders on, backing pieced; just need to send this one to the quilter.

This is how we have been spending our weekends - Basketball, cheerleading, and archery tournaments.



I am fighting the crud, and it is winning.  I don't get sick often, but when I do, it hits hard!  Girl Scout cookie season starts in February, and Jeff goes to China for 10 days. I am taking a machine quilting class through the quilt guild.   It will be a busy month, and probably not a lot of time for sewing, so my goals for February will be light. 

February Goals: 
Two - Shipshewana blocks
Six - Dear Jane triangles
Eight -  Double nine patch blocks


Linking up to Ground Hog Day Celtic Solstice update with Bonnie Hunter @ Quiltville.

Sunday, January 26, 2014

Dear Jane - So close, yet so far.

I am so excited to finally have the center of this top together.  It has been in progress for 15 years!  I have been reflecting a lot on not only my quilt journey, but the actual journey this UFO has been on.

On the original quilt, Jane Stickle embroidered her name, year and "in war time"; 150 years ago.


I haven't decided what I will put on my signature corner block.

As a page through the book, I made notations on when I completed a block.  My journey with this project started when I lived in Chicago (1998), and my quilting friend in Des Moines asked me if I would go on a quilt retreat to Shipshewana with her to meet the author of the book, Brenda Papadakis.   Sure I would go along, but I didn't know if I was interested in making the quilt. 

We met Brenda, and she had such passion for this quilt, and listening to her story of discovery, and research sucked me in to waiting to make the quilt.  Our other quilting friends joked we were in a Dear Jane cult.  My Dear Jane journey started with limited quilting skills and limited time, as I was traveling about 40 weeks a year for my job, I did a lot of fabric shopping, but not much quilting. 


The center is together, and I need to start working on the border triangles.  I think 2014 will be the year I get the triangles done and the outside border done.  Not sure if I will get it quilted this year, but I do want to get the top done.  So I will start working on the triangles, a few each month.

Sunday, March 31, 2013

March Sewing

As suspected, I did not get much sewing done this month.   We did take a much needed 12 day family vacation, so we are still trying to get back into the swing of our normal routine.  Suitcases are unpacked, but I have loads of laundry to do.  We are also hosting Easter dinner, so not much time to settle into my sewing room.  We are also moving into our busy season -- All three kids will be playing baseball \ softball, which means almost every night and weekend will be busy!  I need to make sure I have my hexagon project box in the car.

Here is a picture from vacation:


My March goals were:
  • Turn binding on Easy Street and Brown Bricks - Easy Street is DONE! Brown bricks still needs to be finished.  I still need to get a picture of Easy Street, but I am waiting for the weather to get a bit nicer.
  • Finish applique on Jingle medallion - DONE!
  • Dear Jane Progress - Either more blocks or put rows together.

Dear Jane:
I have all 169 blocks for the center done! These are the last 16 I needed to finish.  Next I need to trim them to size, and put together the blocks with sashing and start working on border triangles.



Jingle:
I finished the applique and pieced block, and also finished the medallion center.  So far I am keeping up!





Not sure how much sewing time I will have in April, we have a lot of ball games and kid activities.

April Goals:
Turn binding on Brown Bricks
Sew Dear Jane blocks together
Keep up with Jingle blocks
Mark and pin baste Courthouse Steps


Linking up to Patchwork Times

Monday, March 11, 2013

Dear Jane Check-in

Here is my progress on Dear Jane blocks.  I only have 3 left and will be done with all 169 blocks for the center.  My goal for the month is to get the rest of the blocks done.  I have 4 rows sewn together, sashing cut, so I will just need to trim up the blocks and start putting the rows together. 

We will be on vacation for the next 12 days, so this is what I will be working on when we get home.  Easy Street is also completely finished now, but the weather has been so bad here I have not been able to take it outside for a picture.  Not sure I remember what grass and sun look like.  Looking forward to some sand and sun soon!

 


Linking up to Patchwork Times - Design Wall Monday.

Sunday, February 3, 2013

January Sewing

I have not had a lot of sewing time this month, and it seems the time I have had has not been very focused.  I find I do better if I have a goal, or challenge to complete, otherwise I tend to be a bit scattered.  I spent some time organizing my sewing room, contemplating some new projects, going through some old unfinished projects and helped Jeff installed some new lighting and shelves.

I sent out two quilts - (Easy Street and Brown Bricks) to my longarm quilter this month.  Getting a quilt ready for the quilter takes a bit of time.  Getting the top prepped - Ironing, serging the edges, cutting the batting, piecing a backing, making the binding, shipping off the package.  Always happy when I am able to get things bundled and out the door.  Hopefully I will get these back in February so I can finish them.

Also small group retreat is coming up in early February.  I like to have projects to a certain stage, so I can maximize my productivity, and reduce my mistakes.  I like mindless sewing and not fussy cutting or complex piecing projects, because I am usually distracted by conversation, but I also like to take advantage of dedicated sewing time so I can get a lot done!

I got all 200+ courthouse steps blocks done.  This was my main focus this month,  I was glad to get all of these done! I will be able to get this top together at retreat. 


I am also working on a kit I picked up at the quilt show last fall:  Grant's March
I have the cutting done for the pieced border and about 30 of the mini blocks done.



Dear Jane - I cracked this UFO open, and will work on it a little each month.  This month I completed 5 little blocks.  These are still oversized, I will trim them up when I start adding sashing and sewing rows.

I spent some time experimenting with some applique techniques.  I think I am going to work on this block of the month - Jingle.  I ordered some clearance batik fabric for background and it just came in the mail.  Here is the start of this project:



Leaders and Enders:  Not many of these little ones finished this month, but a few more added to the pile.



Goals for February:
Finish binding on Easy Street and Bricks Quilt
Courthouse steps blocks to a quilt top
Grants March to a quilt top
Cut out a whirligig baby quilt

Sunday, January 20, 2013

Dusty Dear Jane

I decided to challenge myself to finish this quilt top this year.   I put aside my 6 inch civil war blocks for now, and I am going to focus on this as my UFO project in 2013.  Not sure if I will get it quilted, but I am going to really try to get the top done.  It is probably my oldest UFO that I still have the desire to finish.   I am going to do a few blocks and triangles every month.

I think I started the project in 1998.  Yikes!  That makes this project 15 years old!

We were living in Chicago, and my quilting friend in Iowa emailed me and asked me if I wanted to make this with her.  I had only been quilting a few years, and I wasn't sure about this.  She said no problem, we will figure out together, and there is a group on line that posts hints for doing the blocks...and she went on to say, there is a retreat in Shipshewana and I have always wanted to go there, so I will pick you up on the way and we will go together.  Hmm...Ok, my friend had a plan all figured out.


So I started doing a few blocks I could figure out on my own.  I joined the group online.  I started collecting civil war fabrics.  We went to the retreat.  Brenda Papadakis, the author of the book was there.  She was such a sweet lady, getting everyone she talked to enthused about little baby Jane blocks.    I showed her my progress, probably less than 20 little blocks.  She was so encouraging, one bit of advice she gave, that I still think of when working on this quilt - "Finished is better than perfect!"  In my book, on some of the blocks I wrote the date when I completed the blocks.  It looks like I did a few when I started in 1998, then I got another urge in 2001 and did some more blocks, and then again in 2005.  I don't think I have worked on it much in the last few years.

There were so many I had no idea how to tackle and those triangles...I didn't even want to think about those.  I really think that is why I put this away.  I am getting close to getting the blocks done, and I have not done a single triangle or corner block. 

I have the first four rows put together, and I only have 35 blocks left to finish.   I was pretty disciplined as I have been working on this.  I have a fair amount of "easy" blocks that can be finished very quickly.  There are a couple that I will need to spend some time on.

So now that I put this out here as a goal...let's see if I can finally get this one done this year.