Showing posts with label En Provence. Show all posts
Showing posts with label En Provence. Show all posts

Sunday, January 8, 2017

En Provence - Top Complete

I finished up the mystery quilt this weekend!
I added an extra row of blocks, and needed to make a few more green and yellow hour glass blocks, but otherwise I had enough extras of all of the other units to get this one together.

Cooper is studying for finals and decided my music and the humm of my sewing machine was a peaceful way to study and not be distracted.  We had discussions about the Napolean, the periodic table, and figuring taxable income.  Fine with me as I don't get to spend much time with him any more.   Of course, this area of my work room has eluded my organization effort, he doesn't seem to mind, other than the internet is too slow on my computer.



It was windy and cold (22 degrees) today.    No snow or rain, so we took my top outside and hung it on the fence.


Linking to Bonnie Hunter @ Quiltville.  Check out other mystery quilt show and tell.

Sunday, January 1, 2017

En Provence - Week 6




I needed to get Brownie badges sewn on before I started working on the mystery quilt clues. 
 






 I was able to get Friday's clue done on Friday night.

When the reveal came out, I got started on the yellow set of hourglass blocks.  All of the parts are done, ready to start putting together blocks and sashing.  I know I am going to add an additional row to make the quilt longer. I think I have made enough extra parts for the extra blocks and sashing.


Here is my first block and sashing.  I hope I can get this put together on Monday before I go back to work on Tuesday.


Monday, December 26, 2016

En Provence - week 5

So excited that Bonnie posted this clue on Thursday night!  I had it done before I went to bed.


I have all my shopping \ wrapping done, I am not hosting Christmas dinners, so I am enjoying the free time to sew!  

Linking up with Bonnie @ Quiltville.  Check out others working on the mystery quilt!

Sunday, December 18, 2016

En Provence - Week 4


Happy to see another easy week on the mystery quilt.  I think this is the first time I have ever kept up with the clues, so I am sure there is a time consuming one come soon.  Looking forward to the green and yellow triangles that will be coming.  







When I finished up this clue, I decided to piece a background for a project that I am going to try.  It is just five 8 inch strips of creamy batiks.  This will be the base for an applique quilt kit I picked up at our quilt show a few years ago.  I needed to switch out the background fabrics in the kit, because this is for a challenge quilt, and it needs to be a particular size.   I have something else on my design wall, so I just took a quick picture of my work table.



Linking up to Bonnie @Quiltville.  Check out other quilters making En Provence.

Sunday, December 11, 2016

En Provence - Week 3

My project box is filling up.  This week I completed the purple 4 patches, the needed amount and then a few more.

In my clean up I found a bag of purple strips left over from a previous mystery, and they were already cut to the right size.  I used those up.  I am also stretching my limits on selecting fabric. I am very comfortable with "controlled scrappy".  I really pushed myself to use a wider variety of light and dark purples.  I stayed away from the grayed civil war purples, but the brighter purples all got used.


Saturday I went to my quilt guild's annual Christmas Tea.  Board members retire, new ones join the board, end of the year wrap up, new year kickoff.  No speakers this year that interest me, but I might participate in the Presidents challenge.  30x40, pieced background, pink flowers, some sort of applique.  I might be able to use my extra neutral 4-patchs for the background and then I need to come up with a flower design.  Not much progress on sewing room clean up, I just really have a few more bins to organize.  I did find a bunch of Daisy girl scout stuff I am giving to a new troop leader, so another box of stuff cleared out of the house!

Linking to Bonnie's Monday progress Link up, check out other mystery quilters.

Sunday, December 4, 2016

En Provence - Week 2

I was happy to see a Tri Recs clue.  I had my rulers ready, and did a test block Friday night to insure my cutting and sewing was accurate.  I did my cutting on Friday night, and I worked on sewing the units Saturday morning and finished them Saturday night. 




Craft room \ sewing room organization is still in progress.  It is a process, and I am slowly but surely getting to the point where I am itching to sew because I know what I have and what I can finish.   I put the first border on last years Allietare mystery quilt, I just have to finish it off with a scrappy black border.

Linking up to Quiltville, take a look at others progress on the mystery.


Monday, November 28, 2016

En Provence Mystery

I have been on a quilting break, but went to quilt retreat earlier this month, and finished all of the Allietare blocks, and I am slowly getting back to my sewing.  Seems I go in cycles, in the summer I like to work on art journaling, and in the winter I like to settle into the basement and quilt.  I had some health issues this fall with my anemia, a surgery, I am finally starting to feel good and have some energy again. 

Here are my fabrics for the En Provence mystery quilt offered by Bonnie Hunter at Quiltville.
 I am using the suggested colors, I had everything on hand except a few light purples and the magenta. 






I didn't host Thanksgiving this year, so I spent a lot of time cleaning out my sewing room, and reorganizing.   I had no problem getting this clue done on Saturday.  
Here are 250+ 4-patches.  I ended up with extra because I cut more strips than I needed.   Lexi spent the weekend practicing her sewing by using all of my extra quilt parts from previous projects.  So I am sure she will eventually use these extras.



I spent many hours cleaning the sewing room. Unfortunately when my husband came down to check on us, he didn't notice any difference.  I still have a lot of work to do; 20+ years of collecting and it is time to start thinning out projects and fabrics and sewing machines that I won't use in the next 20 years.    I will be donating a lot of fabric to a first year Home Ec teacher that is teaching at an inner city school, and her supplies are limited.  She really wanted me to come help her teach a quilting unit but I can't commit that much time away from work.  My goal is to get all of my craft\art stuff out of the dining room and into the sewing room over my Christmas time off  My only problem is I don't have close access to a sink and that would be more convenient, but I will need to make do.   I am hosting an extended family Christmas in January, so I should be able to get it all done.

I also got Allietare blocks sewn together, just need to add the four corners and decide on borders.  Overall, I am very happy my  "spring" cleaning efforts and quilting progress this weekend.

To see other mystery quilt posts check out this link to Bonnie's blog.