Monday, March 31, 2014

March sewing


Here were my goals for March:

16 Double nine patch blocks - Done
Two Shipshewana blocks - Done

I knew March would be a light sewing month, but I got these done with an hour to spare in March. 


We were out of town nearly two weeks on vacation.  I took along my hexagon project box and made some progress on hexagons.  I have about 40 completed flowers now, and a good start on another twelve or so.  I think I have decided on a plan for these, so this will be my summer project that I will be working on during baseball season.

 





Shipshewana BOM -



Double nine patch blocks - 16

Here is a quick picture from vacation.

And this is how I will be spending the summer.  I love being a baseball mama.



My goals for April:
9 Double nine patch blocks 
Two Shipshewana blocks
I need to choose something else,  but I am not feeling particularly inspired by anything.  I need to put on the last border of Robins Nest, and I could keep working on my Dear Jane triangles.  I also have 3 quilts to get sent off to the quilter, so I can get them back and finished before the State Fair.

Sunday, March 9, 2014

February Sewing

As suspected, I didn't get much sewing done in February.  A short month, combined with long work hours, Girl Scout cookie season, Jeff being in China for two weeks, and fighting off a terrible cold, I was too exhausted to do much more than collapse in my recliner every night. My February update, is even late!

Here were my goals:
February Goals: 
Two - Shipshewana blocks - Done
Six - Dear Jane triangles - Done
Eight -  Double nine patch blocks- not done


Shipshewana Block of the month:



Dear Jane Triangles:



Double Nine patch - I did get enough nine patches done for about 20 blocks, but I didn't get the blocks sewn.  These take a lot of time.   It seems like I have cut a ton of 1.5 inch squares for these, but my little box is about empty.  My goal next month will be to get all of these 9 patches sewn into blocks, and get some cutting done so I can make some more little 9 patches.


This month we are taking a Disney cruise during spring break.  Unlike previous years, we plan to drive to Florida and not fly.  I need to get some hand work prepped for the car ride. 


My goals for March:
16 Double nine patch blocks
Two Shipshewana blocks

Saturday, February 22, 2014

Machine Quilting Class

My guild - Des Moines Area Quilters Guild hosted local speaker Dawn Cavanaugh in January.  Once upon a time, Dawn was one of the first longarm machine quilters in our area.  She machine quilted my very first large quilt, that I made in 1995 for my brother and sister in-laws wedding.  She quilted 3-4 more quilts for me -- My calendar block of the month, my green concentric squares, and a star quilt that I made with 30's reproductions, which won  a blue ribbon at the Iowa State Fair.  Since I was on a limited budget when I started quilting, I only sent her large quilts that I didn't feel I could handle on my sewing machine. 

She got better and better, I moved to Chicago...she is now an instructor for APQS quilting machines and no longer quilts for customers. I am still trying to master machine quilting myself. 

I took her grid fillers class, and after seeing the feather class sample, I wish I would have signed up for that also!    I am still a bit frustrated relearning how to quilt on my new sewing machine.  I thought taking a class would force me to practice.  In reality though, I am just really into piecing quilt tops right now, and not about perfecting my machine quilting.  They both take a lot of time, and I just prefer piecing over machine quilting right now.
Here is the class display sampler, we learned 20+ grid filler \ background quilting patterns.


The first part of the class, she lectured, and gave us some practice sheets, and some acrylic overlays to practice on, will she showed us the best path to do some of the more intricate patterns. 



Then we marked our practice pieces:


Unfortunately I was not feeling well this day at all, I was still battling my 2 week cold.  I stitched two or three sections, but I was getting frustrated with the results.  For me that is pretty typical, it is hard for me to get comfortable in a class setting.  I was also frustrated as I am still learning this machine, I didn't like the free motion foot I have for my machine...and the list of frustrations continued.  I put my sewing away, and just practiced on paper instead.    I didn't even take a picture of any of my stitched sections.

I am looking forward to trying some of the patterns on my monthly mini quilts.  Good class, I just wished I felt better!

Monday, February 3, 2014

Red and White Quilt

SewCalGirl is hosting a series of Red and white quilt challenges this year on her blog.

The first challenge is red and white quilts completed before 2014.  I finished this top in Aug 2013 and blogged about it here. 


This quilt was a free block of the month, Just Takes 2.  Gay and Brenda continued in 2013 with a free series of school house blocks, and this year they are starting a reproduction of an applique quilt. I am saving the patterns, but haven't committed to starting that one yet.


I searched out a new-to-me longarm quilter.  This quilt has a lot going on, and I wanted a quilter who can take each block and really add to the design.   I saw her work on several quilts in a local show, and she did some custom work that my normal quilter doesn't do. Unfortunately my normal quilter has spoiled me and has really quick turnaround.   I sent this one off several months ago, and it is not back yet...so it was a finished top in 2013, and hopefully a finished quilt in 2014!

Check out the link as others will be adding to this virtual quilt show.

Saturday, February 1, 2014

January Sewing

My January goals were:
Finish Robins Nest top - Not done.
Ten Double 9-patch blocks -Done
Two Shipshewana blocks - Done
Four Dear Jane Triangles - Done

Robin's Nest:  I have to do the last border. The stars are done, I need to cut some triangles, and applique some hexagon in the open corners of the borders I already finished.  This one makes my brain hurt, and it is testing my skills.   I needed to take a break on this one.  I will probably finish this one at winter retreat.


Dear Jane -  These don't look much like triangles yet, as I will trim them when I am ready to start putting together the borders.  These are all from the top row.  Learning to tolerate paper piecing, as that is the best way to get most of these done.  

Double Nine Patch -  oyy...these are smaller than 7 inches and time consuming, luckily they are easy.  I am doing the nine patches as leaders \ enders project, and as I am working on my other projects, I am cutting my scraps into pieces to use on this.   I got 11 done this month.
 
Temecula Small quilt - This was the kit for January, and I made it according to the instructions, but it doesn't look like the sample picture.  I think the squares should have started larger, but I didn't have enough fabric in the kit to cut the squares larger.  Oh well, I think I will add a blue border to frame this. 

Shipshewana BOM:

Celtic Winter Solstice -Borders on, backing pieced.  Just need to get this sent to the quilter.  


School House Quilt - borders on, backing pieced; just need to send this one to the quilter.

This is how we have been spending our weekends - Basketball, cheerleading, and archery tournaments.



I am fighting the crud, and it is winning.  I don't get sick often, but when I do, it hits hard!  Girl Scout cookie season starts in February, and Jeff goes to China for 10 days. I am taking a machine quilting class through the quilt guild.   It will be a busy month, and probably not a lot of time for sewing, so my goals for February will be light. 

February Goals: 
Two - Shipshewana blocks
Six - Dear Jane triangles
Eight -  Double nine patch blocks


Linking up to Ground Hog Day Celtic Solstice update with Bonnie Hunter @ Quiltville.