Monday, May 12, 2014

Slow Sunday Stitching

I am going to try to do better at putting updates on my blog.  I stitch almost everyday for at least 15 minutes, but because those found minutes are usually handwork, I don't tend to post a lot of finished results.  I am going to start linking up with Kathy's Quilts on Sundays as I have a lot of applique and English paper piecing things to share.

I have been doing a lot of English paper piecing and experimenting with different sizes, shapes and colors.  I have mostly been focusing on using reproduction prints.  I can't imagine doing a whole quilt of the same design and shape, so at some point I will need to figure out what I will do with these. Maybe a sampler or row quilt?   For now I am content to use these as busy work in the car, or at appointments and practices.  I have been enjoying fussy cutting and looking for interesting designs on my fabrics.  I have also been experimenting with basting techniques and different threads.  

So here is my first contribution to Slow Stitching Sunday, on a Monday, and my attempt at updating my blog more often.


These are the 2 inch diamond paper pieces, and I treated myself to the acrylic template so I could do some fussy cutting.  This is also the first time I have glue basted.  I think I like that for these bigger pieces, and will try it on a Lucy Boston block also.  I still prefer thread basting hexagons, not through the paper but corners only on the back.  Time will tell though how long the glue sticks, but still releases from the paper easily when I am ready to remove it. 


French Toast casserole




I am testing my ability to create a blog post from my phone.




Here is a picture of the French toast casserole that we took to brunch on Mothers Day. It is puffy when it comes out of the oven but by the time we reached our destination it was flatter.  This is a super easy recipe and the kids love it. You make it the night before and bake in the morning. I will need to remember this is a good recipe to make before leaving for a long day at the ball fields. I will post the recipe when I get home. 

Saturday, May 3, 2014

April Sewing

My April goals were small, because I knew with travel and kid activities my sewing time would be limited.  I did get a lot of hexagons basted on my trip to Florida.
9 Double nine patch blocks 
Two Shipshewana blocks

Shipshewana Block of the month:


I have been getting these little quilt kits from Temecula Quilt Shop, and when I went to put another one away, I realized I have just been letting these stack up.  I got six of these done this month, and have about 5 or 6 more to do.  I will quilt these some other day.




Double Nine Patch -  I got 9 blocks done.  My scrap box is getting low, I need to do some more cutting.



We have baseball tournaments every weekend in May, so here are my May Goals:
Shipeshewana Blocks
Three little quilts
Ten Hexagon flowers


Monday, March 31, 2014

March sewing


Here were my goals for March:

16 Double nine patch blocks - Done
Two Shipshewana blocks - Done

I knew March would be a light sewing month, but I got these done with an hour to spare in March. 


We were out of town nearly two weeks on vacation.  I took along my hexagon project box and made some progress on hexagons.  I have about 40 completed flowers now, and a good start on another twelve or so.  I think I have decided on a plan for these, so this will be my summer project that I will be working on during baseball season.

 





Shipshewana BOM -



Double nine patch blocks - 16

Here is a quick picture from vacation.

And this is how I will be spending the summer.  I love being a baseball mama.



My goals for April:
9 Double nine patch blocks 
Two Shipshewana blocks
I need to choose something else,  but I am not feeling particularly inspired by anything.  I need to put on the last border of Robins Nest, and I could keep working on my Dear Jane triangles.  I also have 3 quilts to get sent off to the quilter, so I can get them back and finished before the State Fair.

Sunday, March 9, 2014

February Sewing

As suspected, I didn't get much sewing done in February.  A short month, combined with long work hours, Girl Scout cookie season, Jeff being in China for two weeks, and fighting off a terrible cold, I was too exhausted to do much more than collapse in my recliner every night. My February update, is even late!

Here were my goals:
February Goals: 
Two - Shipshewana blocks - Done
Six - Dear Jane triangles - Done
Eight -  Double nine patch blocks- not done


Shipshewana Block of the month:



Dear Jane Triangles:



Double Nine patch - I did get enough nine patches done for about 20 blocks, but I didn't get the blocks sewn.  These take a lot of time.   It seems like I have cut a ton of 1.5 inch squares for these, but my little box is about empty.  My goal next month will be to get all of these 9 patches sewn into blocks, and get some cutting done so I can make some more little 9 patches.


This month we are taking a Disney cruise during spring break.  Unlike previous years, we plan to drive to Florida and not fly.  I need to get some hand work prepped for the car ride. 


My goals for March:
16 Double nine patch blocks
Two Shipshewana blocks