Wednesday, January 1, 2014

December Sewing

I have been enjoying my winter break from work.  The kids go back to school tomorrow, and I go back to work.


December Goals:
Work on Bonnie Hunter's Mystery - Celtic Solstice - In progress...keeping up with the clues so far.
Small Group gift exchange small quilt - Done sort of, I made a quilt, but decided on a different gift.
Shipshewana BOM - Done



Celtic Solstice -
I have been keeping up...here are all of the parts through Clue 5. Bonnie posted the reveal today, New Years Day, so I will be working on this while everybody else is watching the Outback Bowl.


Small Group Gift exchange - my small group does a homemade gift exchange for the holiday item can be baked, crochet, knitting, crafty, quilted...anything goes.  Originally I planned to give this, but when I went shopping for a frame, I didn't like the options.  I came home with this plastic frame, but I really didn't like it.

So I decided on a plan B.  I do digital scrapbook layouts, so I made this up instead. I framed it and thought it could hang in someones sewing room.  I need to get one printed for my room.  I love hanging with this group of gals, so inspiring and I learn something new whenever we are together.  And we are raising another generation of crafty girls!


Shipshewana BOM -  I changed up the star on this block.  I had the Tri Rec ruler on my cutting table, so I used that.


Raffle quilt block -    I picked up a kit for a raffle quilt block at the last guild meeting.  Not sure what the final design will be but the theme of the next show is "Symphony of Quilts"



Jingle -  I got the top done.  I will probably send this out for quilting.  Indoor pictures for these...it is snowing and too cold to take these outside for pictures and it is bigger than my design wall.

Schoolhouse Sampler -  Top almost done.  I can't find the yardage for the last border.  I will finish this one as soon as I find that hunk of fabric.


Robins Nest -  Let's just say this quilt is a challenge.  I will be glad to get the last two borders on this one.  



ISU quilt top and pillowcase - I don't have a backing for this one yet, but will quilt this one myself.




I need to decide which Block of the months I will do in 2014.  I am not sure yet which ones I am going to do.  I do want to make good progress on a Sue Garman pattern, so I think I will set a monthly goal to do 8-10 Shoofly and Double 9-patch blocks. If I did that many each month, I still won't have enough at the end of the year for the quilt, but I will have a nice stack.  If I use my civil war repros that I am using for my Shipshewana quilt, I can work on them at the same time.  This will be my Leader \ Ender project for the year.  I need to work on my Dear Jane also, maybe I will plan to do a few triangles a month also.  These blocks are small...they finish smaller than 7" inches.




I think that I will still keep doing the monthly goals, that seemed to help me stay focused.  By the end of 2014, I would like to be finishing my Dear Jane top.  I think I will choose another block of the month from Homestead Hearth quilt shop.

So my January goals will be:
Finish Robins Nest top
Ten Double 9-patch blocks
Two Shipshewana blocks
Four Dear Jane Triangles

Sunday, December 29, 2013

Celtic Solstice - Clue 5

I have been busy in my sewing room.  I need to spend some time organizing my sewing area.  I had Jeff hang a shelf so I can display some of my antique sewing items.  I also got rid of a dresser, that at one time I had plans to refinish.  I know that will never happen, so I gave it away and ordered a couple shelf units. Those won't get here until next week, but I will have a lot more usable storage.

I got the ISU quilt top done, and only have final outer borders to put on Jingle and the School House quilt.  Next on the list is to tackle Robins Nest. I also prepped a couple Afternoon Delight applique blocks. 

I did take an afternoon to do clue 5 of Celtic Solstice.


Cut:


Sew:

Press:


Looking forward to seeing how all of these parts will come together:


Still hoping the Chevrons will frame the blocks, but here is a star block using the units from Clue 5.


Linking up with Bonnie Hunter @ Quiltville.

Sunday, December 22, 2013

Snow Day, Sew Day - Celtic Solstice Clue 4

My view of my deck this morning: 



Unfortunately my boys are at a KC Chiefs game, so that meant I needed to take care of the snow on the driveway and sidewalks.  I kept going until the snowblower died...I think it ran out of gas.  I got the main part of the driveway and sidewalks, so that was good enough.  Probably not as neat as my husband would do, but he knows better than to complain.
 

Once this job was done, I had no plans of leaving my toasty house for the rest of the day.  Banana bread baking, soup ready for later and plenty of Diet Coke, I was ready for a sew day.

First order of business - Patch Sewing...Chiefs hat, cub scout and girl scout patches.  No mending this week.

Second order of business - Celtic Solstice.  Easy clue this week, especially since I already have 2 inch purple strips leftover from the half square triangles clue.

Cut:

Sew:

Press:


We have a lot of parts now...I hope the Chevrons will be used to frame the star blocks in some way.
 

Next on the list...I am going to get an early start on a present that I need to have done at the end of summer.  This will be for our summer nanny.  She is a education major at Iowa State University and will be a senior next year.  I picked up this kit a few years ago at the AQS show in Des Moines.   I also got the Iowa Hawkeyes and Chicago Cubs version, but those will be done another day.

Confession --  I really don't like fusible \ machine applique, but it has it's place.  I know once I get the applique done, this will go together really fast.   I haven't really used my new machine for applique, and it did really good!


I still have a lot of presents to wrap, but can only do that when the angels are sleeping.  I am off work until Jan 2, so I hope to get a lot more done in the next two weeks!

Linking to Bonnie Hunter @ Quiltville - Head over there to see other Celtic Solstice projects in progress.

Monday, December 16, 2013

Celtic Solstice - Clue 3

This month is going too fast!  Last week was busy with holiday chorus concerts, and three holiday get togethers on top of the normal weekly activity schedule.

We finally have all of the Christmas decorations up, but I still have a lot of shopping to do.  One more week of work, then I am off the rest of the year.

I was happy the clue this week went together pretty quickly, I was also able to get my Shipshewana blocks done, but nothing else.    I needed to spend some time this weekend getting ready for an Investiture ceremony for girl scouts, and it is also almost cookie time, so I need to start getting that organized.

Cut:

Sew:

Press:


 Caught up on all steps:


 Linking up with Bonnie Hunter @ Quiltville.

Sunday, December 8, 2013

Celtic Solstice - Clue 2

Today was our guild annual meeting.  Outgoing and incoming board members, renewing membership and signing up for classes.  I signed up for 4 classes - A machine quilting class with Dawn Cavanaugh, two applique classes with Karen Kay Buckley and a class by a local quilter - Joann Belling.   I am excited to take classes, I haven't done a guild class for several years.  I hope I can manage to get away from work for these!

Before I can even get started on my sewing, I usually find something on my sewing machine table that needs mended or altered.  Today it was black dress pants that needed altered before a chorus concert next week, Scout patches and sewing a patch on a winter hat.

My silly model - I really need to find one of the these in kid size.
 

Finally on to clue two:
Cut:

 Sew:
 Press:



Lined up:

Living happily together, waiting for the next step:

Linking up with Bonnie Hunter @ Quiltville.