I don't think I have ever posted my Robin's nest center medallion.
I am busy working on borders 3, 4, and 5. I am making good progress on the diamond borders.
The medallion center is appliqued down to a large background then I added the scalloped applique border. I have never done applique using the lines on the fabric as a guide for needleturn. I went to a Jinny Beyer lecture several years ago, and she called this "soft edge piecing." She appliqued shapes using the lines of a paisley fabric into complicated pieced blocks. I liked the way this border turned out.
I need to decide if I am going to cut away the background behind the applique. Even though it is pretty heavy, I think I am going to leave the layers for stability.
Hexagons are going slow, but I am still working on them at gymnastics and football practice. I may need to pick up the pace if I get all of the other borders done.
I sent off my Just Takes 2 top to the quilter last week. I am looking forward to getting that one back.
Linking up with Patchwork Times - Design wall Monday
Saturday, September 7, 2013
Monday, September 2, 2013
August Sewing
August Goals:
Just Takes 2 - finish sections 2 and 3 - Done
Shipeshewana blocks - Done
Jingle blocks - Done
My sewing machine was in the shop for maintenance for part of the month, but I still managed to get some sewing done. I focused on getting my Just Takes 2 blocks and top put together. It is a big quilt - it measures 90x110. I have the backed pieced, but I don't have a large enough batting on hand. I will get this sent to the machine quilter as soon as I get a batting.
Shipshewana blocks 9 & 10
Jingle Blocks:
Berries are not stitched down yet, but I the prep work is done.
Small Quilts:
These are some of my leader \ ender blocks. I have hundreds of these 3" blocks.
This is a little quilt kit from Temecula Quilt Shop.
These are Lori Smith patterns:
Here are a couple small baby quilts that I quilted for a friend. She does my binding, I stipple baby quilts.
September Goals:
Robin's Nest - Borders 3, 5, 7
Just Takes 2 - School house blocks
Jingle blocks
Linking up with Design wall Monday - Patchwork Times
Just Takes 2 - finish sections 2 and 3 - Done
Shipeshewana blocks - Done
Jingle blocks - Done
My sewing machine was in the shop for maintenance for part of the month, but I still managed to get some sewing done. I focused on getting my Just Takes 2 blocks and top put together. It is a big quilt - it measures 90x110. I have the backed pieced, but I don't have a large enough batting on hand. I will get this sent to the machine quilter as soon as I get a batting.
Shipshewana blocks 9 & 10
Jingle Blocks:
Berries are not stitched down yet, but I the prep work is done.
Small Quilts:
These are some of my leader \ ender blocks. I have hundreds of these 3" blocks.
This is a little quilt kit from Temecula Quilt Shop.
These are Lori Smith patterns:
Here are a couple small baby quilts that I quilted for a friend. She does my binding, I stipple baby quilts.
September Goals:
Robin's Nest - Borders 3, 5, 7
Just Takes 2 - School house blocks
Jingle blocks
Linking up with Design wall Monday - Patchwork Times
Saturday, August 31, 2013
Sunday, August 18, 2013
2013 Iowa State Fair Results
The Iowa State Fair ends today. I went to the quilt opening the night before the fair started, and we went as a family on Friday morning.
Here is a picture of the kids near the DNR building.
Here were my entries, only one ribbon this year.
Large quilt, one person - Courthouse Steps:
Small Quilts - Courthouse Steps
Table Runner
Block Exchange; Large quilt:
Large quilt, two or more - Easy Street:
Here is a picture of the kids near the DNR building.
Here were my entries, only one ribbon this year.
Large quilt, one person - Courthouse Steps:
Small Quilts - Courthouse Steps
Table Runner
Block Exchange; Large quilt:
Large quilt, two or more - Easy Street:
Saturday, August 10, 2013
Hexagon Progress Check-in
August marks the changing of seasons for us. The nanny headed back to college last week, there are only a few more weeks of summer vacation before the kids head back to school. After 12 years of paying for daycare, all of the kids are now in school full time. I will have a kindergartner, 1st grader, and 7th grader. Baseball is also winding down, travel ball is done, summer rec ball is almost done, and football conditioning has started.
I thought it would also be a good opportunity to show my hexagon progress for Robin's Nest. This is what I got finished during baseball season. Time spent waiting for games to start, practices to finish, road trips, hotel rooms etc. Bonus quilting time in the car.
I only have about 6 flowers completely done. But, I have all of the hexagons basted, and I just need to finish up a few more rings, and then add in my centers! I think I will get them done during football season! Then I will need to applique them to my background.
I thought it would also be a good opportunity to show my hexagon progress for Robin's Nest. This is what I got finished during baseball season. Time spent waiting for games to start, practices to finish, road trips, hotel rooms etc. Bonus quilting time in the car.
I only have about 6 flowers completely done. But, I have all of the hexagons basted, and I just need to finish up a few more rings, and then add in my centers! I think I will get them done during football season! Then I will need to applique them to my background.
Subscribe to:
Posts (Atom)
